The Splendor - Go Vap District

  • Package : Main Construction, Finishing and M&E Works
  • Scale : Total construction area: 24.693 m², 2 blocks, 01 basement, 1 ground floor, 11 floors and 1 technical floor on each block. 209 apartments in total from 76.9 m2 to 111 m²
  • Location : Nguyen Van Dung, Go Vap District, HCM City
  • Client : Takco & Thanh Nhut
  • Year : 2009
  • Progress : Completed
Photos Construction updates

- In the recent years, the development of apartment, office buildings which has a very convenient way relationship with the urbanization speed of the country should be big potential to grow. The GDP growth rate of Viet Nam is quite high and stable. With the optimistic growth of the economics, demand for apartment and office buildings also grows day by day.

- With the economic growth rate over 7% in recent years, Vietnam will have more investment projects to build office buildings, apartments and villas with high quality. With the above-stated reasons, Tan Ky Construction Real Estate Trading Corporation and Thanh Nhut Construction Trading Co., Ltd has decided to invest and construct the Splendor Luxury Apartments at the center of Go Vap District.

- Located in the front of Nguyen Van Dung and bordering the front of Ben Cat river, the Splendor is the convenient transport connections to the district centers, Tan Son Nhat International Airport, Quang Trung Software Park, close to the transasian road system to  Binh Duong, Dong Nai and the West Provinces.

- The Splendor is designed in a modern way, with two stable blocks of flats open towards the river. It’s like a big open gate to the nature. Wishing to give you an ideal living place, Tan Ky is not only interested in aesthetics in architectural design, safety, but also pay attention to the smallest details, each of these elegant pieces of color, elegance to the impressive decoration lines.

Picture: 3-D View of The Splendor Go Vap District

- After one year from the starting date of the project, the foundation and the basements of the project have been finished. At the present, the surrounding work has now entered the stage of the frame construction (started on March 18th, 2009). The project is estimated to be finished within 14 months. Roof off work is planned on December 25th, 2009 and ready for living occupancy in August, 2010.

- Total building floor area (excluded basement and technical floor): 24,693 m2.

- Scope of the project including two apartment blocks. Each block includes 01 basement, 1 ground floor, 11 high floors and technical one.

- Total of 206 apartment units for lot area from 76.92 m2 to 111m2

- Total capital investment: VND 200 billions (Two hundred billion VND)

- Client: co-investing the project:

  • Tan Ky Construction Real Estate Trading Corporation
  • Thanh Nhut Construction Trading Co., Ltd.


- Contractor: Tan Ky Construction Real Estate Trading Corporation

- Location: Nguyen Van Dung Street, Ward 6, Go Vap District, HCM City.